- VISIT OR CALL THE BUILDING INSPECTOR:
You may also need input from other departments and agencies, including the Town’s Planning Commission or Waupaca County Zoning.
You will need to know - who will do the work, scope of the work, location of work, and how the work will be done. Sketches, drawings, plans or other documentation of the proposed work will generally have to be submitted for review depending on the size and scope of the project.
- WAIT DURING THE REVIEW PROCESS:
The majority of permit applications are processed with little delay. The Building Inspector will determine if your project is in compliance with the construction codes and other municipal ordinances. Your plans will be reviewed (plan check) and usually returned to you after Town Board approval – on the third Tuesday of every month. Some minor plans may be reviewed over-the-counter, depending on the scope and size of the project.
- RECEIVE RESULTS OF THE REVIEW PROCESS:
If compliance with the code is determined, the plans are stamped approved and upon payment of fees and receipt of other agency clearances, a permit is issued. If compliance is not determined, you will be given a list of corrections. After making the corrections resubmit the plans for a second review. Most plans are approved after the second review.
The building permit is the document granting legal permission to start construction. Keep a copy of the approved set of plans and job card at the site for the inspector to use during inspections. Changes should be brought to the Building Inspector attention immediately. Changes will generally require a review and approval in the same manner as the original application.
Each major phase of construction must be inspected to make sure work conforms to the Code and approved plans. The person responsible for the construction project should request the inspections. 24 hour advance notice is required. If inspector finds that some work does not conform to the Code, the inspector will advise (and provide a written notice) that the situation is to be remedied. If the violation is serious and presents a safety hazard, a stop work order may be posted until the problem is resolved. Another inspection may be necessary before work is allowed to resume.
If there are no items to be resolved after work has been complete, the inspector will sign off the permit. The permit, along with other construction documents will be placed in the permanent address file for your property. After all other agency inspections and clearances are completed, the utilities to your building are released and a Certificate of Occupancy is issued, if applicable.